Details
-
Bug
-
Resolution: Done
-
Major
-
jboss-fuse-6.1 on OSE
-
None
-
%
Description
The Install time for the cartridge is too long, other cartridges on the system take 30 seconds to 2 minutes (under load) to install the cartridge.
https://issues.jboss.org/browse/ENTESB-2018 and https://issues.jboss.org/browse/ENTESB-1999 are caused because of the install time for the cartridge.