Uploaded image for project: 'JBoss BPMS Platform'
  1. JBoss BPMS Platform
  2. RHBPMS-2043

Incorrect Sequence Flow redraw after SwimLane resize in IE10 and IE11

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Major Major
    • 6.1.0
    • None
    • jBPM Designer
    • None
    • All Windows

      Description of problem:
      If you try to resize SwimLane in IE10 or IE11 (using up-left corner of SwimLane) elements inside SwimLane will be moved but Sequence Flow elements not (IE11), Sequence Flow elements will be moved partially (IE10), see screenshot in attachment.

      Version-Release number of selected component (if applicable):
      6.1.2.CR3 and below (at least to 6.1.GA)

      How reproducible:
      always

      Steps to Reproduce:
      1. Create Business Process with SwimLane
      2. Resize SwimLane (using up-left corner)
      3. Move something else (Tasks, Events etc.)

      Actual results:
      Point 2: With SwimLane resizing Task and other elements will be moved, but Sequence Flow elements not (IE11), Sequence Flow elements will be moved just partially (IE10). See attachment.
      Point 3: All Sequent Flow elements will be redrawn in correct way.

      Expected results:
      All elements including Sequent Flow elements will be moved correctly after SwimLane resize without any delay (Point 2).

      Additional info:
      None

            jeremylindop_jira Jeremy Lindop (Inactive)
            kgaevski@redhat.com Kirill Gaevskii
            Kirill Gaevskii Kirill Gaevskii
            Kirill Gaevskii Kirill Gaevskii
            Jeremy Lindop (Inactive), Kris Verlaenen, Rajesh Rajasekaran
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: