Uploaded image for project: 'Red Hat Fuse'
  1. Red Hat Fuse
  2. ENTESB-3917

[FSW 6.0.x] Multiple SwitchYard tests fail for a single RESTEasy endpoint

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: jboss-fuse-6.0
    • Fix Version/s: None
    • Component/s: SwitchYard
    • Labels:
      None
    • Steps to Reproduce:
      Hide

      A reproducer (switchyard-rest-test.zip) attached. Simply running mvn test shows you the problem.

      Show
      A reproducer (switchyard-rest-test.zip) attached. Simply running mvn test shows you the problem.

      Description

      Platform JIRA for SWITCHYARD-2787

      When there are multiple test methods for a single RESTEasy endpoint in a SY test class, some of them sporadically hang and eventually fail with a timeout error after a very long time (about 5 mins).
      This test issue seems to occur only with RESTEasy binding and not with other bindings.

        Gliffy Diagrams

          Attachments

            Issue Links

              Activity

                People

                • Assignee:
                  tcunning Tom Cunningham
                  Reporter:
                  tadayosi Tadayoshi Sato
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  4 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved: