Uploaded image for project: 'Application Server 7'
  1. Application Server 7
  2. AS7-5477

Allow processing of the module phase to be deferred

    Details

      Description

      Currently, there are a lot of DUPs in the INSTALL phase that do nothing when there is no Module attached to the DU. This would be the case when an unresolved OSGi bundle runs through the INSTALL phase.

      Alternatively, it was suggested to only process INSTALL DUPs when there actually is a Module available.

      This essentially would boil down to adding a dependency on a resolve service to the MODULE phase.

        Gliffy Diagrams

          Attachments

            Issue Links

              Activity

                People

                • Assignee:
                  thomas.diesler Thomas Diesler
                  Reporter:
                  thomas.diesler Thomas Diesler
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  1 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved: