Uploaded image for project: 'Teiid'
  1. Teiid
  2. TEIID-1388

Appears to be a limit of only one functional SalesForce connector in Teiid at a time.

    XMLWordPrintable

Details

    • Bug
    • Resolution: Done
    • Blocker
    • 7.1.1
    • 7.1.1
    • Salesforce Connector
    • None
    • Documentation (Ref Guide, User Guide, etc.)

    Description

      It appears they only one SalesForce connector can be run at a time. If you preview a model from Designer and there are no SF connections in Teiid, it works. When you create a DS for the VDB and deploy, the VDB cannot get connections from SalesForce. If you delete the preview VDB and Datasource, then the deployed VDB begins working.

      I originally suspected that the problem might be that we are running out of connections; SalesForce limits you to 5 simultaneous connections per username/password. But I deployed the two DataSources with different credentials, and the result did not change. Need to investigate more.

      Think that we do need to default the SF DS to a pool of 1 and then doc that it should be bumped to 5 for production. The current default is 10, and that should never be. Even 5 will exhaust the limit with just a preview connection.

      Attachments

        Activity

          People

            rhn-engineering-rareddy Ramesh Reddy
            rhn-engineering-jdoyle John Doyle
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: