Uploaded image for project: 'SwitchYard'
  1. SwitchYard
  2. SWITCHYARD-2501

Cannot edit delay between polls in camel-rss-binding

    Details

    • Steps to Reproduce:
      Hide

      1. Import quickstart camel-rss-binding (from master branch or 2.0.0.Beta1)
      2. Open switchyard.xml
      3. Try to edit poll options in the rss binding

      Show
      1. Import quickstart camel-rss-binding (from master branch or 2.0.0.Beta1) 2. Open switchyard.xml 3. Try to edit poll options in the rss binding
    • Workaround Description:
      Hide

      This only affects quickstart configurations not created via the tooling. To work around this, create a new binding and copy the details from one to the other and delete the original binding.

      Show
      This only affects quickstart configurations not created via the tooling. To work around this, create a new binding and copy the details from one to the other and delete the original binding.

      Description

      Cannot edit delay between polls in camel-rss-binding quickstart.

      Note that we can edit this property in new rss binding.

        Gliffy Diagrams

          Attachments

            Activity

              People

              • Assignee:
                bfitzpat Brian Fitzpatrick
                Reporter:
                apodhrad Andrej Podhradsky
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: