Details
-
Task
-
Resolution: Obsolete
-
Minor
-
None
-
3.0-rc1
-
None
Description
Idea would be to have a flag on Agenda that is set as early as possible, which all the methods check. if the flag is true, then the innards of each method can be syncrhonized.