Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-9649

Timeout problem with JBoss 7.0.1.Final

    XMLWordPrintable

Details

    Description

      When I start my JBoss with JBossAS tools inside of my eclipse, the server start correctly and prints out the message "JBoss AS 7.0.1.Final "Zap" started in 2073ms - Started 98 of 153 services (55 services are passive or on-demand)". The start timeout is configured with 10 seconds. It seems eclipse didn't notice the server is started, and after 10 seconds I got the error message: „Starting JBoss 7.0.1.Final has encountered a problem. Server JBoss 7.0.1.Final Server failed to start".

      With JBoss 7.0.0.Final the timeout work correctly and I got the error only when I use JBoss 7.0.1.Final.

      I got this error with the developer milestone 2.3.0.v20110624-0505-H8-M2 as well as with the latest nightly build 2.3.0.v20110829-0855-H677-M3

      Attachments

        Issue Links

          Activity

            People

              rob.stryker Rob Stryker (Inactive)
              tobias81 Tobias Koltsch (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: