Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-26538

Openshift 3 Server Adapter unusable with 100 projects

    XMLWordPrintable

Details

    • Hide
      1. Create a connection to an openshift cluster in which you have access to close to 100 projects or more
      2. This in itself will take a long time but you can cancel and still use other features of the Openshift integration (e.g. port forwarding)
      3. Now try to create a Server Adapter for an Opensfhit service. The wizard tries to load projects and services again and takes up to an hour before the dialog window shows up.
      Show
      Create a connection to an openshift cluster in which you have access to close to 100 projects or more This in itself will take a long time but you can cancel and still use other features of the Openshift integration (e.g. port forwarding) Now try to create a Server Adapter for an Opensfhit service. The wizard tries to load projects and services again and takes up to an hour before the dialog window shows up.

    Description

      With 100 projects available in the Openshift cluster (3.9) it can take more than an hour to load the Server Adapter wizard while the "Loading projects and services ..." message appears in the progress View.

      Eclipse Neon
      JBoss Tools 4.4.4

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              lionelve_jira Lionel Orellana (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: