Uploaded image for project: 'Tools (JBoss Tools)'
  1. Tools (JBoss Tools)
  2. JBIDE-24656

Split CDK3 server adapter integration tests into separated classes

    XMLWordPrintable

Details

    • Enhancement
    • Resolution: Done
    • Major
    • 4.5.1.AM2
    • 4.5.0.AM1
    • integration-tests
    • None

    Description

      I decided to divide quite time-consuming CDK server adapter integration tests into smaller test cases due to time that is needed to run all of these test cases in one test class. The one class with all server adapter test cases will be divide into 4 independent classes.
      org.jboss.tools.cdk.ui.bot.test.server.adapter.CDK3IntegrationTest will be split into
      CDK3IntegrationStartTest
      CDK3IntegrationRestartTest
      CDK3IntegrationDockerTest
      CDK3IntegrationOpenshiftTest
      It will be possible to run cdk pr-check job much faster, if it would contain only one complex test case, instead of 4 test cases that each requires to start cdk 3 server adapter.

      Attachments

        Issue Links

          Activity

            People

              odockal@redhat.com Ondrej Dockal
              odockal@redhat.com Ondrej Dockal
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: