-
Bug
-
Resolution: Done
-
Critical
-
None
-
None
Case for 4.0.1 was TP change was done late, how do we run tests without having to rebuild everything again.
Possible options:
1) Create new testsuite that depends on all other testsuites and run them in surefire test.
2) use something else than surefire to run the already built testsuites.
- blocks
-
JBIDE-7727 Add Hudson job which runs JBDS SWTBot tests
- Closed
- is duplicated by
-
JBIDE-13914 Have a test run that runs test plugins for each component in a fully installed JBT
- Closed