Uploaded image for project: 'Red Hat CodeReady Studio (devstudio)'
  1. Red Hat CodeReady Studio (devstudio)
  2. JBDS-4447

JBoss Tools Fuse not listed on Summary screen

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Minor Minor
    • 11.0.0.GA
    • 11.0.0.AM1
    • installer
    • None
    • devex #135 July 2017
    • 3
    • NEW

      The JBoss Tools Fuse isn't listed on Summary screen though I have checked it on Features screen.

      There is summary I got:

      Installation path:
          /home/lvalach/JBDS/test4
      Java VM path:
          default
      Components to install:
          Red Hat JBoss Developer Studio 11.0.0.AM1
      Disk Space:
          Available Disk Space: 65.28 GB 
          Required Disk Space: 753.83 MB
      

      I think that problem is here [1]. Fuse is no longer in integration-stack.fuse package but in com.jboss.devstudio.fuse package.

      https://github.com/jbdevstudio/jbdevstudio-product/blob/3a0300cb7f849b12199af3fccb4ddd1f1c13e1b7/installer/src/panels/com/jboss/devstudio/core/installer/UpdatePacksPanel.java#L42

            lvalach_jira Lukáš Valach (Inactive)
            lvalach_jira Lukáš Valach (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: