Uploaded image for project: 'JBoss A-MQ'
  1. JBoss A-MQ
  2. ENTMQ-2236

[fabric, scheduler] non clean shut down of the Scheduler causes the broker failing to restart

    XMLWordPrintable

Details

    • ?
    • Hide

      Disabling the scheduler support in the broker should work around the problem.

      Show
      Disabling the scheduler support in the broker should work around the problem.
    • Hide

      I am not currently able to reproduce the problem reliably.

      Show
      I am not currently able to reproduce the problem reliably.

    Description

      If the broker gets stopped while starting up (as part of a bundle refresh during Fabric container startup) it may raise a BrokerStoppedException and it may fail to properly shut down the Scheduler KahaDB instance.

      Upon broker restart (again, as part of bundle refresh) the broker will fail start up fully as the Scheduler KahaDB instance is still locked.
      The broker will raise

      Database data/mybroker/mybroker/scheduler/lock is locked by another server. This broker is now in slave mode waiting a lock to be acquired
      

      and will fail to start up fully

      Attachments

        Activity

          People

            gtully@redhat.com Gary Tully
            rhn-support-tmielke Torsten Mielke
            Votes:
            1 Vote for this issue
            Watchers:
            4 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: